Abstract:Taking the structural renovation of the No. 5 belt gallery workshop at the Sizhou Concentrator of Dexing Copper Mine as an example, in view of the aging-induced deterioration and partial collapse of the upper enclosure system, as well as increased service loads from upgraded crane operations, two distinct renovation strategies are proposed: Scheme I (demolition and reconstruction of existing walls) and Scheme II (in-situ strengthening of retained masonry walls). Both schemes are modeled and computationally verified by using PKPM structural analysis software. A comprehensive comparative evaluation is conducted, encompassing the influence on the underlying powder ore bunker, technical and economic performance, key construction risk factors, and long-term durability and maintenance implications. The results show that both schemes significantly reduce the total load on the upper part, without causing additional reinforcement of the fine ore bin structure, and the structural safety performance meets the requirements of the specifications. Although scheme I entails higher steel consumption and more extensive demolition work, it is characterized by lower overall capital investment, a shorter construction duration, mature construction technology, and more transparent and predictable long-term maintenance requirements. Conversely, scheme II provides satisfactory short-term protective performance through the applied strengthening layer; nevertheless, there is a hidden risk of internal masonry deterioration, necessitating sustained long-term monitoring at non-negligible expense. Overall, scheme I is recommended as the preferred renovation option with more advantages. The research results provide a valuable reference for multi-criteria decision-making in the structural renovation of comparable aging industrial belt gallery facilities.