    摘要:

    为保证隧道衬砌模板台车的施工安全,以某高速公路分岔式长隧道为例,根据给出衬砌台车的尺寸,对隧道二次衬砌台车模板系统进行了设计,计算了其纵肋和环向肋内力和变形,并基于ANSYS分析软件,计算了台车门型结构内力和变形。结果表明,模板系统、台车结构的强度与刚度均满足设计要求。根据计算结果,建议浇筑二次衬砌混凝土时应注意对称浇筑,保持台车受力对称,且在门架的底纵梁处纵向每隔1 m加设1道I20a工字钢水平支撑,在两主肋之间增加环向次肋角钢。

    Abstract:

    In view of the safety of the tunnel lining formwork trolley, with a case study of bifurcated long highway tunnel, a secondary lining trolley formwork system of the tunnel has been designed according to the size of the lining trolley, with a calculation made of the internal force and deformation of the longitudinal and circumferential ribs, followed by a further calculation of the internal force and deformation of the trolley door structure based on ANSYS software. The results show that the strength and rigidity of the formwork system and the trolley structure meet the design requirements; according to the calculation results, it is recommended that the secondary lining concrete should be poured symmetrically to keep the trolley stress symmetrical, with a horizontal support of I20a I-steel be added at the longitudinal interval of 1 m at the bottom longitudinal beam of the portal frame, and the circumferential secondary rib angle steel should be added between the two main ribs as well.

    参考文献
    相似文献
    引证文献
引用本文

刘思远,张华雨,祝方才,罗 睿,周正茂.二次衬砌台车荷载计算及数值模拟[J].湖南工业大学学报,2021,35(2):7-14.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-01-02
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-01-30
  • 出版日期:
文章二维码