Abstract:Aiming at the access problem of Changsha waste incineration power plant, three access schemes are proposed. Through flow calculation and stability analysis of the system, selects a more appropriate solution. Compared to the other two schemes, the recommended solution has the best vision adaptability and higher economic efficiency.