Analyzes and researches the process which realizing the short pile’s reusing through passing partial working force on to near enhanced soldier pile with the aid of crown beam, and proposes the long-short piles support method to reduce the disposing of short pile and achieves cost savings and smooth transition of working procedure. The actual project case verifies the feasibility and effectiveness of this method, which can also be used in broken piles disposing.