Abstract:Combining with the specfic circumstances of open-cut method construction of Liangdong Road subway station on Wuxi Metro line one, introduces station deep pit monitoring program. Analyzes the envelope horizontal displacement and subsidence monitoring data, and investigates the rules and mechanism of the displacement and the inner axial force changing in different construction conditions, providing reference for future similar pit constructing.