夹桩时预制桩的强度分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家自然科学基金资助项目(50927502)


Analysis on the Strength of Pre-Fabricated Pile under Pile Clamping
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    对夹桩时夹桩机构和预制桩的静态受力进行了分析,结论表明:夹桩时预制桩的屈服从与下钳口接触处的内壁开始;预制桩能承受的最大夹桩力随着夹桩钳口与预制桩之间的接触长度、预制桩的外径和壁厚的增大而增大。

    Abstract:

    An analysis of the static forces of pile clamping mechanism and pre-fabricated pile under pile clamping was carried out. The results reveal that the yield of pre-fabricated pile under pile clamping starts from the inner wall contacting with the lower jaw; the sustainable pile clamping force of pre-fabricated pile under pile clamping increases with adding properly contact length between pile clamping jaw and pre-fabricated pile and with augmenting becomingly the outside diameter and wall thickness of pre-fabricated pile. Keywords :pile clamping;pre-fabricated pile;strength

    参考文献
    相似文献
    引证文献
引用本文

周 旭,明兴祖,陈育荣,孙传琼.夹桩时预制桩的强度分析[J].湖南工业大学学报,2010,24(5):71-74.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-07-02
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-09-02
  • 出版日期:
文章二维码