Abstract:Based on calculation software of limited element program BDCMS of plane bar system and its temperature difference distribution mode, the theory of value change is gained, and the measured results are compared by calculating the stress under uniform temperature and gradient temperature of bridge body and frustra body in the process of continuous rigid frame bridge with large-span and high-pier construction. It also sums up the characteristics of stress change of the construction under the temperature change.