韶钢3 200 m3高炉停炉实践
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Blowing Off in 3 200 m3 Blast Furnace of Shaoguan Steel Corporation
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    韶关钢铁集团有限公司炼铁厂受到原燃料品质下降的影响,炉况失常,决定对高炉进行停炉中修。详细介绍了停炉的全过程,包括降料面前的炉况、休风前的准备、停炉操作、炉外出铁等环节,总结了此次停炉中修的成功经验。

    Abstract:

    Affected by the quality of raw fuels, the furnace of the iron works of Shaoguan Iron and Steel Group Co.Ltd. has been abnormal in condition, which makes the furnace maintenance necessary. A detailed introduction has been made to the whole process of the furnace shutdown, including the conditions of the falling surface, preparatory work before the blowing-down, the operation of the furnace shutdown and the tapping outside the furnace, followed by a summary of the successful experience of the shutdown repairing.

    参考文献
    相似文献
    引证文献
引用本文

潘伟恩,丁时明,柏德春.韶钢3 200 m3高炉停炉实践[J].湖南工业大学学报,2017,31(4):50-54.