高墩连续大跨预应力刚构桥温度效应影响分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Research on Temperature Effects on Prestressed Concrete Continuous Rigid Frame Bridge with High Pier and Large Span
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    运用平面杆系有限元程序BDCMS计算软件,拟合温差分布模式,计算高墩大跨连续刚构桥施工过程中梁体、墩身在均匀温度和梯度温度下的应力,得出测点理论值应力变化,并与实测结果做对比。阐述结构在温度变化过程中应力变化特点。

    Abstract:

    Based on calculation software of limited element program BDCMS of plane bar system and its temperature difference distribution mode, the theory of value change is gained, and the measured results are compared by calculating the stress under uniform temperature and gradient temperature of bridge body and frustra body in the process of continuous rigid frame bridge with large-span and high-pier construction. It also sums up the characteristics of stress change of the construction under the temperature change.

    参考文献
    相似文献
    引证文献
引用本文

胡竞先.高墩连续大跨预应力刚构桥温度效应影响分析[J].湖南工业大学学报,2009,23(2):6-9.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2008-11-18
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-09-02
  • 出版日期: